Assuming you are building a 3000 sft house, KPTCL + BWSSB connection fee, deposits ,liason etc may come to about 1.5 L
Other govt. charges will be Road cutting payable to BBMP if any.
Search found 5 matches
- March 15th, 2012, 1:41 pm
- Forum: Civil Construction
- Topic: Cost of BESCOM and BWSSB
- Replies: 1
- Views: 3921
- March 15th, 2012, 1:37 pm
- Forum: Civil Construction
- Topic: Flush Doors: Which is good brand ?
- Replies: 1
- Views: 3436
Re: Flush Doors: Which is good brand ?
We have used Nikki extensively in most of our projects since 2003-04 so far its doing well & no complaints as such from clients.
- June 27th, 2011, 2:08 pm
- Forum: Civil Construction
- Topic: Construction Steel
- Replies: 7
- Views: 12396
Re: Construction Steel
Hi,
As long as the brand is ISI & TMT complaint its all the same without any difference.
Gowtham
As long as the brand is ISI & TMT complaint its all the same without any difference.
Gowtham
- May 13th, 2011, 1:02 pm
- Forum: Civil Construction
- Topic: Construction Cost
- Replies: 3
- Views: 8891
Re: Construction Cost
You have mentioned only basic skeletal materials, Bulk of the final price depends on
1. Flooring
2. Wood works
3. Painting & other finishes.
If you go for good ceramic or medium quality vitrified around 45-50 per sft & Sal wood & basic distemper finish you can still finish your house @ 1.1 L per ...
1. Flooring
2. Wood works
3. Painting & other finishes.
If you go for good ceramic or medium quality vitrified around 45-50 per sft & Sal wood & basic distemper finish you can still finish your house @ 1.1 L per ...
- May 13th, 2011, 12:55 pm
- Forum: Civil Construction
- Topic: Architect fees
- Replies: 8
- Views: 17303
Re: Architect fees
Hi.
8% is on the higher side..4-5% should give you all the drawings & services you have mentioned.
Gowtham
Civil Contractor
8% is on the higher side..4-5% should give you all the drawings & services you have mentioned.
Gowtham
Civil Contractor