Does setback include compound wall
Posted: September 15th, 2014, 4:11 pm
I asked this question on a different post, but since it's a separate topic many people would like to know, posting the question here.
All the people I asked including engineers have not given a satisfactory answer. Especially in Bangalore, I get a feeling that bribing is a foregone conclusion for everything and people don't seem to worry at all about the bye-laws.
I hear that for a site with depth of 9-12 meters, setback should be 12% in front and 8% on remaining 3 sides. Now my question is, whether this can include compound wall (4 inch thickness).
Thanks
Rajeev
All the people I asked including engineers have not given a satisfactory answer. Especially in Bangalore, I get a feeling that bribing is a foregone conclusion for everything and people don't seem to worry at all about the bye-laws.
I hear that for a site with depth of 9-12 meters, setback should be 12% in front and 8% on remaining 3 sides. Now my question is, whether this can include compound wall (4 inch thickness).
Thanks
Rajeev