Nivas wrote:Ramki,
below ground level these are items to be done, i feel pillars are only long tip of ice berg , lot of works happens below.
1) Column Pit Earth work
2) 4 inch PCC Base
3) Column RCC Foundation ( Mat, couple of feet of concrete pour depending on design ) ( Shuttering required)
3a) Column alignment and marking.
4) Column Pedestal RCC ( depends on design)
5) Column casting till plinth level ( Shuttering required)
6) Plinth beam foundation (Stone masonry or Concrete , Shuttering required)
7) Plinth beam ( RCC , connecting all columns, Shuttering required).
Typically Structural engineer gives the design of all these components. ( Steel frame assembly\ steel rods \ Concrete strength \ dimensions etc)
Thanks very much Nivas. Some more doubts(according to the points mentioned by you):
1. Pit Earth work understood.
2. What is that PCC Base. What does PCC stands for and how is different from regular cement/concrete?
3. Foundation understood.
3a) understood
4) what is pedestal RCC?
5) Columns which is see outside - understood.
6) What is Plinth beam foundation?
7) SAme as above.
Sorry for too many questions.
Regards,
Ramki